Topic: Kennedy Space Center

4 chapters across the catalog

Under Salt
Episode 1501 6:44 - 7:38

1501: Under Salt

NASA Artemis 1 Moon Rocket Launch Preparations

NASA begins the slow rollout of the Artemis 1 moon rocket from the Vehicle Assembly Building to the launch pad at Kennedy Space Center. Officials express confidence in a November 14, 2022, launch date following previous technical setbacks. The ten-day lead time for the rollout is characterized as a marketing and public relations strategy to build anticipation for the mission.

Jacked Up Joe
Episode 1483

1483: Jacked Up Joe

NASA Artemis I Moon Mission Launch Delays

NASA scrubbed the planned launch of the Artemis I rocket for the second time in one week due to a persistent liquid hydrogen fuel line leak. Engineers at the Kennedy Space Center attempted to troubleshoot the issue three times without success, forcing the agency to roll the rocket back to the Vehicle Assembly Building. This technical failure likely delays the next launch window until late September or October 2022.

Injectables
Episode 1481 1:06:02 - 1:12:15

1481: Injectables

Artemis 1 Moon Mission, NASA, Cape Canaveral

NASA prepares for the Artemis 1 mission, the first step in a plan to return humans to the lunar surface. The hosts discuss the history of the name "Cape Canaveral" versus "Cape Kennedy" and the technical goals of the uncrewed flight, which carries dummies and a Snoopy doll to test the Orion spacecraft.

3X3
Episode 1246 2:53 - 5:13

1246: 3X3

SpaceX Launch Scrubbed, Numerology and 33 Symbolism

The SpaceX launch scheduled for May 27, 2020, was scrubbed 16 minutes before liftoff due to weather conditions at the Kennedy Space Center. A theory is presented regarding the significance of the 4:33 p.m. launch time, linking the number 33 to the Knights Templar and historical "abort mission" codes. The delay is framed within a broader context of symbolic numbers used by organizations like the Masons and Illuminati.