The first U.S. lunar landing mission in over 50 years, the Peregrine Lander developed by Astrobotic Technology, suffered a critical fuel leak shortly after launch. The failure prevents the craft from reaching the lunar surface as planned. NASA has subsequently announced delays to its Artemis program, pushing back the next crewed mission to orbit the moon until 2025.

